install - Rob Preston removing the busses

The New Studio Build Diary: Phase 3 – The Install

The new control room is painted & the floors are dry, I’m about 15 pounds lighter & ready to go! And to go along with the new space – I have a new console – a Soundtracs Megas 32 channel / 24 bus. It took 4 of us to move the console into Chris Holston’s […]

paint - color swatches

The New Studio Build Diary: Phase 2 – Painting & Floors

Ok, the framing is complete, brand new electrical wiring is installed throughout the studio, the walls are up & all seams have been sealed with OSI SC-175 Acoustical Sound Sealant. Now it’s time for the painting to begin. First, I rented a paint sprayer from Home Depot to “black-out” the ceiling and all of the […]

framing - double walls between cr & lr with 6x4 window 2

The New Studio Build Diary – The Build

Well, I’ve found a great space! It is actually an old hosiery/knitting mill (the historic King Craft Hosiery, circa 1945). The new space is in a great location & is a total of 1386 sq. feet with 12 foot ceilings throughout. The new space features the original concrete floors & masonry from the mill era. […]